AZIZI DEVELOPMENTS L.L.C
Developer profile from the Dubai Land Department registry. Pivot7 does not compute on-time delivery rates from this dataset because scheduled versus actual completion is not provided as a comparable field across projects.
- Registered projects
- 144
- Registration date
- 2014-05-12
- Legal status
- Limited Responsibility
- License number
- 552794
- Phone
- 971|0565153670
Registered projects
- Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF RESIDENTIAL/COMMERCIAL BUILDING 2B+G+9+R with internal and external finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-05-25Status: FINISHED - Meydan One Community (Al Merkadh)
2B+G+8+R Residential and Commercial. The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 54.3% · Target 2027-03-13Status: ACTIVE - Al Furjan (Jabal Ali First)
PROJECT CONSISTS OF B+G+2P+10+R HOTEL APARTMENTS LOCATED IN JABAL ALI FIRST. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2017-09-20Status: FINISHED - Al Furjan (Jabal Ali First)
PROJECT CONSISTS OF G+2P+7+R HOTEL APARTMENTS LOCATED IN JABAL ALI FIRST. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2018-03-11Status: FINISHED - Meydan One Community (Al Merkadh)
2B+G+7+1R Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-02-14Status: FINISHED - Meydan One Community (Al Merkadh)
(2B+G+9+R), Residential and Commercial Building
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-03-27Status: FINISHED - Meydan One Community (Al Merkadh)
2B+G+7+1R Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-02-13Status: FINISHED - Meydan One Community (Al Merkadh)
2B+ G +8 +1R.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 81.1% · Target 2026-03-30Status: ACTIVE - Meydan One Community (Al Merkadh)
This Project have Residential/Apartments + Interior Services + Commercial -3 Basement+ Ground+ 20 Floor +RETAIL.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 53.1% · Target 2025-02-05Status: ACTIVE - Meydan One Community (Al Merkadh)
B+8+F Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-03-27Status: FINISHED - Meydan One Community (Al Merkadh)
B+ G +20 +1R.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-03-27Status: FINISHED - Dubai Studio City (Al Hebiah Second)
1B+G+8F+R+1UR,The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-04-30Status: FINISHED - Dubai World Central (Madinat Al Mataar)
5 Building-4B+G+11
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2026-01-28Status: NOT_STARTED - Dubai World Central (Madinat Al Mataar)
3B+G+10+R+TR.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 52.5% · Target 2025-12-30Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
2BUILDINGS/4B+G+12 & 42+G+13
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0%Status: NOT_STARTED - Dubai World Central (Madinat Al Mataar)
4B+G+17+R RESIDENTIAL AND COMMERCIAL BUILDING.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-08-30Status: NOT_STARTED - Dubai World Central (Madinat Al Mataar)
N/A
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 8.9% · Target 2026-05-30Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
3B+G+10+R+TR Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 42.2% · Target 2025-12-30Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
3B+G+16 Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 45.1% · Target 2025-10-30Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
Tower A: 3B + G + 10 ? Residential Building Tower B: 3B + G + 10 ? Residential Building
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 38.4%Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
A 3B+G+10 B 3B+G+10 C 3B+G+10 D 3B+G+10 E 3B+G+10 F 3B+G+10
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 37.5%Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
3B+G+10+R Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 30.3% · Target 2025-12-30Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
3B+G+14+R Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 47.9% · Target 2025-12-30Status: ACTIVE - Sama Al Jadaf (Al Jadaf)
3B+G+M+5P+43+2R (TOWER A, F, G,H & RETAILS) (RESIDENTIAL & RETAIL)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-09-16Status: PENDING - Meydan Racecourse Community (Nad Al Shiba First)
PROJECT CONSISTS OF B+G+4+R RESIDENTIAL COMMERCIAL APARTMENTS .
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Al Furjan (Jabal Ali First)
Hotel Building (B+G+2P+11+Duplex Floor+R)with external and internal finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2020-05-31Status: FINISHED - Al Furjan (Jabal Ali First)
2B+G+2P+8+R+Top Roof
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2028-01-15Status: NOT_STARTED - Meydan One Community (Al Merkadh)
Residential/commercial project consists of 1 building 2B+G+9 +Gym in the Roof
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+7+ Roof with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF 2B+G+8+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN AL MERKADH. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential/commercial project consists of 1 building 2B+G+8 with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-07-14Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+9 floors+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-10-16Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2 B+ G +10 +1R with internal and external finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building: 2B+G+10 floors with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-12-31Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+9+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-03-30Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+8+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+ 7+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+7+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-09-12Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+ 8+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+ 9+R with internal and external finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential building with retail (2B+G+9+R)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial + Residential 2B+G+ 10+R
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-03-04Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+ 10+R ; with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-05-16Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Commercial+Residential 2B+G+ 10+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-03-04Status: FINISHED - Meydan One Community (Al Merkadh)
3B+G+10+R Residential and Commercial. The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 34.0% · Target 2027-03-13Status: ACTIVE - Meydan One Community (Al Merkadh)
2B+G+7+R Residential and Commercial. The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 34.6% · Target 2027-03-13Status: ACTIVE - Meydan One Community (Al Merkadh)
3B+G+10+R Residential and Commercial.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 29.4% · Target 2027-03-13Status: ACTIVE - Meydan One Community (Al Merkadh)
Proposed 2B+G+9+R Residential and Commercial building
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 41.4% · Target 2027-05-30Status: ACTIVE - Meydan One Community (Al Merkadh)
2B+G+8+R Residential and Commercial. The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 85.6% · Target 2027-03-13Status: ACTIVE - Meydan One Community (Al Merkadh)
2B+G+8+R Residential and Commercial.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 67.7% · Target 2027-03-13Status: PENDING - Meydan One Community (Al Merkadh)
G+
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-05-30Status: PENDING - Meydan One Community (Al Merkadh)
Proposed 2B+G+8+R Residential and Commercial building. The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 48.5% · Target 2027-05-30Status: ACTIVE - Meydan One Community (Al Merkadh)
2B+G+8+R Residential and Commercial
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 56.6% · Target 2027-03-13Status: PENDING - Meydan One Community (Al Merkadh)
PROPOSED RESIDENTIAL BUILDING (2B+G+9F+ROOF)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 41.0% · Target 2027-05-30Status: ACTIVE - Meydan One Community (Al Merkadh)
Proposed 2B+G+8+R+Roof Top Residential and Commercial building. The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 46.2% · Target 2027-05-30Status: ACTIVE - Meydan One Community (Al Merkadh)
PROPOSED RESIDENTIAL BUILDING (2B+G+8+ROOF)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 32.1% · Target 2027-05-30Status: ACTIVE - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+9 floors with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-07Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Residential+ Commercial+ 2B+ G+ 7 Floors+ 1 Roof with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-22Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Residential+ Retail+ 2B+ G+ 10 Floors+ Roof with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential / Apartments + External Services + Services D 2B + G + 9 + 1R.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-07-30Status: FINISHED - Meydan One Community (Al Merkadh)
3B+ G +20 +1R, Residential / commercial building.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 69.8% · Target 2025-12-30Status: ACTIVE - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF 2B+G+10+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN AL MERKADH. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-07-25Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+9 floors with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF 2B+G+9+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN AL MERKADH. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2 B+G+7+ Roof with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-04-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+7+R
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-07-14Status: FINISHED - Meydan One Community (Al Merkadh)
Residential/commercial building (B+G+7+R)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF RESIDENTIAL/COMMERCIAL BUILDING B+G+10+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF 2B+G+10+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN AL MERKADH. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-12-31Status: FINISHED - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF 2B+G+10+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN AL MERKADH. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+8 with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF 2B+G+9+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN AL MERKADH. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-05-16Status: FINISHED - Meydan One Community (Al Merkadh)
Residential building with retail (2B+G+7+R)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-06-30Status: FINISHED - Meydan One Community (Al Merkadh)
1 Residential and Commercial Building, 2B+ G+ 7Floors+ Roof with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-09-13Status: FINISHED - Meydan One Community (Al Merkadh)
1 Residential+ Commercial Building, 2B+ G+ 7Floors+ Roof With Gym with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-09-14Status: FINISHED - Meydan One Community (Al Merkadh)
1 Residential and Commercial Building, 2B+ G+ 7 Floors+ Roof with internal and external finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-09-14Status: FINISHED - Meydan One Community (Al Merkadh)
Residential / commercial building 2 BASEMENT+ GROUND FLOOR +9 FLOOR +1ROOF
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
1 Building, Residential+ Retail+ 2B+ G+ 10 Floors+ Roof with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-03-04Status: FINISHED - Meydan One Community (Al Merkadh)
PROJECT CONSISTS OF 2B+G+9+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN AL MERKADH. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential building with retail, 2Basement +Ground floor +10 floor+1Roof
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential Building with retails at GF, 2B+G+8+R
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential building with retail, 2Basement + Ground Floor + 9 Floor + 1 Roof
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+8 with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+8 with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail project consists of 1 building 2B+G+9+R with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential / commercial building 2Basement + Ground Floor + 9 Floor + 1 Roof
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-01-18Status: FINISHED - Meydan One Community (Al Merkadh)
Residential / commercial project consist of: 2B + G + 9 + Roof with internal and external finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-09-30Status: FINISHED - Meydan One Community (Al Merkadh)
Residential & Retail building: 2 basement + ground floor + 9 floors with internal and external finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-08-23Status: FINISHED - Dubai Health Care City Phase 2 (Al Jadaf)
Residential Building (B+G+2P+14) with external and internal finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2019-08-31Status: FINISHED - Al Furjan (Jabal Ali First)
Hotel Apartments (B+G+2P+12+R)With external and internal finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-01-10Status: FINISHED - Meydan Racecourse Community (Nad Al Shiba First)
RESIDNETIAL / COMMERCIAL PROJECT 2B+G+6+1R LOCATED IN AL NAD AL SHIBA FIRST. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-03-08Status: FINISHED - Al Furjan (Jabal Ali First)
Residential Building (B+G+2P+12+R)with external and internal finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2020-03-16Status: FINISHED - Al Furjan (Jabal Ali First)
Residential Building consist of (G+P+10)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2016-09-04Status: FINISHED - Dubai World Central (Madinat Al Mataar)
PROPOSED 4B+G+18+R+TR RESIDENTIAL & COMMERCIAL
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-09-25Status: NOT_STARTED - Dubai World Central (Madinat Al Mataar)
Tower A: 4B +G + 19 + R + TOP ROOF ? Residential & Commercial Tower B: 4B +G + 19 + R + TOP ROOF ? Residential & Commercial
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 16.0% · Target 2027-09-16Status: ACTIVE - Dubai World Central (Madinat Al Mataar)
PROPOSED TOWER A-(4B+G+16+R) & TOWER B-(4B+G+17+R)RESIDENTIAL & COMMERCIAL Building
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-05-30Status: NOT_STARTED - Dubai World Central (Madinat Al Mataar)
PROPOSED RESIDENTIAL and COMMERCIAL BUILDING (4B+G+15+ROOF)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-06-02Status: NOT_STARTED - Dubai World Central (Madinat Al Mataar)
4B+G+14+R Residential & Commercial building
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-12-31Status: NOT_STARTED - Al Furjan (Jabal Ali First)
RESIDENTIAL BUILDING G+P+10 LOCATED IN JABAL ALI FIRST,THE DESGIN CONSIST OF CONCRETE STRUCTURE WITH INTERNAL AND EXTERNAL FINISHES
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2016-11-14Status: FINISHED - Al Furjan (Jabal Ali First)
PROJECT CONSISTS OF G+2P+7+R HOTEL APARTMENTS LOCATED IN JABAL ALI FIRST. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2018-03-21Status: FINISHED - Al Furjan (Jabal Ali First)
PROJECT CONSISTS OF B+G+2P+10+R HOTEL APARTMENTS LOCATED IN JABAL ALI FIRST. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2017-11-01Status: FINISHED - Dubai Health Care City Phase 2 (Al Jadaf)
Residential Building B+G+2P+17 with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2022-07-14Status: FINISHED - Dubai Health Care City Phase 2 (Al Jadaf)
2B+G+2P+18F+R, Residential project with retail
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-04-02Status: FINISHED - Dubai Health Care City Phase 2 (Al Jadaf)
2B+G+2P+19F+R.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 41.9%Status: ACTIVE - Trade Center First · AZIZI DEVELOPMENTS L.L.C
G+130+RMIXED UESED TOWER WITH 9B +G+10P
Completion: 0.5% · Target 2030-08-30Status: ACTIVE - Dubai Studio City (Al Hebiah Second)
Building 1 (Tower A): 8 F+R ? Residential Apartment Building 2 (Tower B): 8 F+R? Residential Apartment Shared (Basement+ Ground): 2B+G - Residential-Apartment + Commercial-Retail
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 6.3% · Target 2026-04-30Status: ACTIVE - Palm Jumeirah (Palm Jumeirah)
Project serviced hotel apartments located in Palm Jumeira consist of B+G+9 floors made of concrete structure with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2017-01-06Status: FINISHED - Al Furjan (Jabal Ali First)
2B+G+2P+7+R HOTEL APARTMENTS BUILDING
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0%Status: NOT_STARTED - Al Furjan (Jabal Ali First)
2B+G+2P+9+R
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-07-30Status: NOT_STARTED - Al Furjan (Jabal Ali First)
Residential building located in community Jabal Ali First, Al Furjan area. The building is designed as G+1 podium+11 floors and to be built out of concrete structure with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2017-02-22Status: FINISHED - Down Town Jabal Ali (Jabal Ali Industrial Second)
3B+G+M+5P+15+R+Roof Top
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2028-01-16Status: NOT_STARTED - Al Furjan (Jabal Ali First)
G+ 2P + 9 + R Residential Building
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-06-17Status: NOT_STARTED - Down Town Jabal Ali (Jabal Ali Industrial Second)
PROJECT CONSISTS OF B+G+2P+17+R RESIDENTIAL BUILDING WITH RETAIL AT GROUND FLOOR LOCATED IN JABAL ALI INDUSTRIAL SECOND. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2020-05-31Status: FINISHED - Al Furjan (Jabal Ali First)
Residential building located in community Jabal Ali First, Al Furjan area. The building is designed as G+1 podium+ 10 floors and to be built out of concrete structure with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2016-11-30Status: FINISHED - Down Town Jabal Ali (Jabal Ali Industrial Second)
3B + GROUND + M + 3BA + 16 + R
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-08-04Status: PENDING - Dubai Health Care City Phase 1 (Um Hurair Second)
Proposed 3B+G+4P+11+R offices building with retail
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2028-02-13Status: NOT_STARTED - Al Furjan (Jabal Ali First)
Hotel Apartments Building 2B + G + 7 + R with internal and external finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-08-08Status: FINISHED - Al Furjan (Jabal Ali First)
Hotel Apartment Building (G + 2P + 7 + R)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2024-06-05Status: FINISHED - Jumeirah Village Circle (Al Barsha South Fourth)
PROPOSED BUILDING 3B+G+4P+14+R+Roof Top RESIDENTIAL & RETAIL BUILDING
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2028-01-23Status: NOT_STARTED - Al Furjan (Jabal Ali First)
Residential Building (G+2P+9+R+TOP ROOF). The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 29.0% · Target 2027-10-11Status: ACTIVE - Al Furjan (Jabal Ali First)
Residential Building (B+G+2P+12+R)With external and internal finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2020-01-09Status: FINISHED - Al Furjan (Jabal Ali First)
3B + G + 2P + 11 Hotel Apartments
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-06-17Status: NOT_STARTED - Al Furjan (Jabal Ali First)
Residential building (UG+G+2P+9+R)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 58.3%Status: ACTIVE - Al Furjan (Jabal Ali First)
Residential Building (B+G+2P+11+Duplex Floor) with Retails @ Ground Floor, With external and internal finishes
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2021-03-17Status: FINISHED - Al Furjan (Jabal Ali First)
(B+G+2P+with Swimming Pool+8+R)With Retail at GF.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2025-07-31Status: FINISHED - Meydan Racecourse Community (Nad Al Shiba First)
PROJECT CONSISTS OF 2B+G+4+R RESIDENTIAL APARTMENTS AND RETAIL LOCATED IN AL NAD AL SHIBA FIRST. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2023-12-11Status: FINISHED - Dubai Sports City (Al Hebiah Fourth)
B+G+3P+14 ,Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 47.5% · Target 2025-02-02Status: ACTIVE - Al Furjan (Jabal Ali First)
Residential building located in community Jabal Ali First, Al Furjan area. The building is designed as G+1 podium+11 floors and to be built out of concrete structure with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2016-10-23Status: FINISHED - Dubai Studio City (Al Hebiah Second)
Tower 1: G + 9F + R ? Residential Building Tower 2: G + 8F + R ? Residential Building Shared (Ground & 2 Basement): 2B+G+R
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 88.5% · Target 2025-04-30Status: ACTIVE - City Of Arabia (Wadi Al Safa 4)
PROPOSED (3B+G+5P+25) RESIDENTIAL & COMMERCIAL BUILDING
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-04-16Status: NOT_STARTED - City Of Arabia (Wadi Al Safa 4)
PROPOSED (3B+G+5 POD+35+R) RESIDENTIAL/ COMMERCIAL BUILDING
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-04-30Status: NOT_STARTED - City Of Arabia (Wadi Al Safa 4)
PROPOSED (3B+G+5P+34F+ROOF) MIXED USE (RESIDENTIAL + RETAIL) Building
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-06-03Status: NOT_STARTED - City Of Arabia (Wadi Al Safa 4)
PROPOSED (3B+G+5P+34F+ROOF) MIXED USE (RESIDENTIAL + RETAIL)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-04-04Status: NOT_STARTED - City Of Arabia (Wadi Al Safa 4)
PROPOSED (3B+G+5P+30)MIXED USE (RESIDENTIAL +COMMERCIAL)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-03-26Status: NOT_STARTED - City Of Arabia (Wadi Al Safa 4)
PROPOSED (3B+G+5P+19) RESIDENTIAL & COMMERCIAL BUILDING
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-04-30Status: NOT_STARTED - City Of Arabia (Wadi Al Safa 4)
PROPOSED (3B+G+5P+29) RESIDENTIAL & COMMERCIAL BUILDING
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-04-30Status: NOT_STARTED - Wadi Al Safa 4 · AZIZI DEVELOPMENTS L.L.C
PROPOSED (3B+G+5P+42+Roof) MIXED USE (RESIDENTIAL+COMMERCIAL)
Completion: 0.0% · Target 2027-05-30Status: NOT_STARTED - City Of Arabia (Wadi Al Safa 4)
MIXED USE (RESIDENTIAL + RETAIL) Tower A (3B+G+5P+38+R) Tower F (3B+G+5P+38+R) Tower G (3B+G+5P+42+R) Tower H (3B+G+5P+42+R)
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2028-09-08Status: PENDING - Palm Jumeirah (Palm Jumeirah)
Hotel Apartments (B+G+9) with internal and external finishes.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2021-01-14Status: FINISHED - Palm Deira (Palm Deira)
Proposed 3B+G+13+R - Hotel APARTMENT BUILDING
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2028-02-12Status: NOT_STARTED - Down Town Jabal Ali (Jabal Ali Industrial Second)
3B + GROUND + M + 3BA + 16 + R
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 0.0% · Target 2027-09-03Status: PENDING - Al Furjan (Jabal Ali First)
PROJECT CONSISTS OF G+P+10 RESIDENTIAL BUILDING LOCATED IN JABAL ALI FIRST. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2016-07-26Status: FINISHED - Al Furjan (Jabal Ali First)
RESIDENTIAL BUILDING G+P+10 LOCATED IN JABAL ALI FIRST,THE DESGIN CONSIST OF CONCRETE STRUCTURE WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2016-05-07Status: FINISHED - Al Furjan (Jabal Ali First)
RESIDENTIAL BUILDING (G+P+10)LOCATED IN JABAL ALI FIRST,THE DESGIN CONSIST OF CONCRETE STRUCTURE WITH INTERNAL AND EXTERNAL FINISHES.
Developer: AZIZI DEVELOPMENTS L.L.CCompletion: 100.0% · Target 2016-05-07Status: FINISHED