EMAAR DEVELOPMENT P.J.S.C.
Developer profile from the Dubai Land Department registry. Pivot7 does not compute on-time delivery rates from this dataset because scheduled versus actual completion is not provided as a comparable field across projects.
- Registered projects
- 92
- Registration date
- 2017-08-28
- Legal status
- Limited Responsibility
- License number
- 543667
- Phone
- 971|549959861
- Website
- —
Registered projects
- Dubai Marina (Marsa Dubai)
Residential and retail project in Marsa Dubai area, proposed to be two towers with common G+5P with 52 units tower 1 G+50F+R having 264 units tower 2 G+37F+R having 170 units made of concrete structure with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2020-09-05Status: FINISHED - DownTown Dubai (Burj Khalifa)
PROPOSED COMMERCIAL / RESIDENTIAL DEVELOPMENT AT BURJ KHALIFA AREA TOWER 1 - 4B+G+51 FLOORS TOWER 2 - 4B+G+46 FLOORS THE BUILDING DESGNED OF CONCRETE STRUCTRUE WITH INTERNAL AND EXTERNAL FINISHES.THE RETAILS ARE SHELL AND CORE.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-12-26Status: FINISHED - DownTown Dubai (Burj Khalifa)
BLVD HEIGHTS - Twin Tower Residential Development Consist of 3B + G + P + Tower-1 (53 levels) & Tower-2 (46 levels) located in Burj Khalifa area.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2020-04-30Status: FINISHED - Zaabeel Second · EMAAR DEVELOPMENT P.J.S.C.
PROPOSED 3 RESIDENTIAL TOWERS COMPRISING T1: B +G+67(584 UNITS) T2: B +G+62(498 UNITS) T3: B +G+54(427UNITS) total units 1509
Completion: 100.0% · Target 2022-08-31Status: FINISHED - DownTown Dubai (Burj Khalifa)
6B+G+3P+79+R Residential.The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-12-09Status: FINISHED - DownTown Dubai (Burj Khalifa)
PROJECT CONSISTS OF 3B+G+M+10P+59 SERVICED APARTMENT LOCATED IN BURJ KHALIFA. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2019-01-16Status: FINISHED - Dubai Harbour (Marsa Dubai)
B+G+8P, T1 57 , T2 42 + Roof Residential+Retail,The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 18.0% · Target 2028-07-31Status: ACTIVE - DownTown Dubai (Burj Khalifa)
tower1 to consist of 1B+G+3P+43 and have 239 apartment units located in boulevard cresent, downtown, Dubai. tower 2 to consist of 1B+G+3P+21 and have 74 apartment units located in boulevard cresent, downtown, Dubai. .
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2019-05-27Status: FINISHED - DownTown Dubai (Burj Khalifa)
Boulevard Point is a residential tower located in MBR boulevard in Dubai Downtown area. Project consist of 4B+G+M+10P+59+R concrete structure with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2020-02-10Status: FINISHED - Dubai Harbour (Marsa Dubai)
Podium : 8Apartments on 4 levels ( P1 to P4) Tower 1 : comprises of G+M+5Podiums+33 floors+ 2R 230 Units Tower 2 : comprises of G+M+5Podiums+26 floors+ 2R 217 Units
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-01-06Status: FINISHED - Me'Aisem Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 487 villas (B+G+2)
Completion: 0.0% · Target 2029-06-30Status: NOT_STARTED - Me'Aisem Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 526 villas (B+G+2)
Completion: 0.3% · Target 2029-09-30Status: NOT_STARTED - Dubai Harbour (Marsa Dubai)
The project is composed of 1B+G+8P+11 Hotel Floors + 33 Res Floors + Roof on Top having a total of 150 Hotel keys 227 Residential Apartments and Retail unit
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 0.1% · Target 2029-09-30Status: NOT_STARTED - DownTown Dubai (Burj Khalifa)
THE PROJECT IS A SINGLE TOWER WITH APPROXIMATE HEIGHT OF 336.20M,CONSISTS OF 3BASEMENT FLOORS AS SHOPPING MALL , FLOORS 2 TO 10AS CAR PARKING IN ADDITION TO 17 FLOORS AS HOTEL CONTAINS 193 ROOMS AND 49 FLOORS AS SERVICED APARTMENTS CONTAINS 208 APARTMENTS.THE PROJECT LOCATED ON MBR BOULEVARD IN DOWNTOWN DUBAI.(3B+G+M+12P+65+R).
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2019-09-25Status: FINISHED - DownTown Dubai (Burj Khalifa)
Project description:- Sky View project consist of-Two Towers- 3 Basements + G+ 3 Podium+ 52/61 Levels for Freehold within Burj Khalifa Area. with external and internal finishes
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2019-09-30Status: FINISHED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 128 villas (G+1)
Completion: 3.0% · Target 2028-06-30Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential Development consisting of 362 Townhouses (G+1)
Completion: 100.0% · Target 2023-06-03Status: FINISHED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
430 (G+1) Townhouses, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 89.0% · Target 2026-09-30Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 244 villas (G+1)
Completion: 5.1% · Target 2028-10-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
486 attached villas (G+2) ,The project designed to have a concrete structure and block with internal and external finishes.
Completion: 64.2% · Target 2027-03-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential Development Consisting of 378 attached villas (G + 2)
Completion: 0.0% · Target 2028-11-30Status: NOT_STARTED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential Development Consisting of 322 attached villas (G+2).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 2.1% · Target 2028-06-30Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential Development Consisting of 332 attached villas (G+2).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 7.3% · Target 2028-07-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
322 attached villas (G+2) Residential, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 48.5%Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
308 (G+1) Residential Townhouses The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2025-12-31Status: FINISHED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential Development Consisting of 330 Townhouses (G+1).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2025-03-31Status: FINISHED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
(G+1) 406 Residential villas. The project designed to have a concrete structure and block with internal and external finishes.
Completion: 72.0%Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Consisting of 372 Townhouses (G+1).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2024-12-30Status: FINISHED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development in consisting of 476 townhouses, the project designed to have a concrete structure and block with internal and external finishes.
Completion: 35.8%Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 156 villas (G+1).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 0.3% · Target 2028-07-31Status: NOT_STARTED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
146 G+1 Residential Townhouses, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 86.1% · Target 2026-08-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 256 villas (G+2).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 24.3%Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 482 villas (G+2)
Completion: 1.4% · Target 2028-12-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 290 villas (G+2)
Completion: 1.4% · Target 2028-10-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 488 villas (G+1)
Completion: 8.3% · Target 2028-08-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 312 villas (G+1).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 6.3% · Target 2028-07-31Status: ACTIVE - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential Development Consisting of 578 attached villas (G + 1)
Completion: 0.0% · Target 2028-12-31Status: NOT_STARTED - Al Yufrah 1 · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 696 villas (G+1).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 10.7% · Target 2028-09-30Status: ACTIVE - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 80 villas (G+1+roof)
Completion: 0.0% · Target 2029-02-28Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 124 villas (G+2)
Completion: 0.0% · Target 2029-06-30Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 179 villas (G+2)
Completion: 0.0% · Target 2029-04-30Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 237 villas (G+2)
Completion: 0.0% · Target 2029-04-30Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 246 villas (G+2)
Completion: 0.0% · Target 2029-04-30Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 138 villas (G+2)
Completion: 0.0% · Target 2029-05-31Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 173 villas (G+2)
Completion: 0.0% · Target 2029-05-31Status: NOT_STARTED - DownTown Dubai (Burj Khalifa)
PROJECT CONSISTS OF 3B+G+M+10P+59 RESIDENTIAL BUILDING LOCATED IN BURJ KHALIFA. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2019-07-22Status: FINISHED - Dubai Marina (Marsa Dubai)
Residential Building with a HealthCare Clinic, (1B+G+2P+29 floors) Total Residential units: 226 Total Clinic units: 1
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 0.0% · Target 2029-09-30Status: NOT_STARTED - Dubai Harbour (Marsa Dubai)
Residential with retails project Podium: G+1UG+1M+6P Tower 1: G+27F+1LR+R Tower 2: G+37F+R+1UR
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2023-03-30Status: FINISHED - DownTown Dubai (Burj Khalifa)
THE PROJECT CONSIST OF 5 BASEMENTS, WITH 5 PODIUM LEVEL, AND TWO TOWERS (G+72 LEVELS) TOWER 1 (G+43 LEVELS). TOWER 2 LOCATED IN BURJ HALIFA COMMUINTY
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-11-29Status: FINISHED - DownTown Dubai (Burj Khalifa)
Tower 1: B+G+M+7P+46+3 Mech + R Hotel and Serviced Apartments. Tower 2: B+G+M+7P+30+3 Mech + R Residential Apartments. The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-12-30Status: FINISHED - DownTown Dubai (Burj Khalifa)
PROJECT CONSISTS OF 3B+G+3P+56+2R HOTEL APARTMENTS WITH RETAIL LOCATED IN BURJ KHALIFA. THE APARTMENTS ARE DESIGNED TO HAVE A CONCRETE STRUCTURE AND BLOCK WITH INTERNAL AND EXTERNAL FINISHES.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2019-03-03Status: FINISHED - Dubai Marina (Marsa Dubai)
Commercial / Residantial / Hotel consist of: 3B+G+54+2 penthouse
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-11-30Status: FINISHED - Wadi Al Safa 6 · EMAAR DEVELOPMENT P.J.S.C.
Freehold project, Aseel consist of 55 residential villas, G+1 located in Wadi Al Safa 6
Completion: 100.0% · Target 2018-10-31Status: FINISHED - DownTown Dubai (Burj Khalifa)
Project is located in Burj Khalifa area, proposed to be 2 towers with common 4B+G+3P+ residential tower: 64 floors+R and retail tower: 1floor+3R, made of concrete structure with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2021-12-09Status: FINISHED - Al Thanyah Third · EMAAR DEVELOPMENT P.J.S.C.
6 buidings with common basement ,ground floor and podium 2 x RESIDENTIAL BUILDINGS (B+G+11+R) 1 X HOTAL BUILDING (B+G+15+2R) 1 X FURNISHED APARTMENT BUILDING (B+G+15+R) 2 x RESIDENTIAL BUILDINGS (B+G+14+R) with internal and external finishes.
Completion: 100.0% · Target 2019-04-15Status: FINISHED - DownTown Dubai (Burj Khalifa)Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2023-03-30Status: FINISHED
- Dubai Harbour (Marsa Dubai)
2B+G+M+(6P)+60+R ,Mix use development. The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 39.3% · Target 2026-12-31Status: ACTIVE - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
492 Townhouses (G+1) Townhouses, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 68.4% · Target 2026-10-31Status: ACTIVE - Arabian Ranches II - AZALEA (Wadi Al Safa 7)
THE PROJECT CONSIST OF 108 DETACHED RESIDENTIAL VILLAS, FREEHOLD OWNERSHIP, WITH G+1 HEIGHT, LOCATED IN WADI AL SAFA 7 WITHIN ARABIAN RANCHES 2 MASTER COMMUNITY.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2019-05-19Status: FINISHED - Arabian Ranches II - SAMARA (Wadi Al Safa 7)
The Project consists of 177 nos. G+1 Villas located in Wadi Al Safa 7, Dubai UAE. The villas are designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2017-10-01Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
Residential Development Consisting of 362 Townhouses (G + 1).The project designed to have a concrete structure and block with internal and external finishes.
Completion: 76.8% · Target 2026-12-30Status: ACTIVE - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
129 (G+2) Villas in a mix of 4 bed and 5 bed.The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2025-09-30Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
131 (G+2) mix of: 4 bed and 5 bed types of Villas, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2025-11-30Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
332 x (G+1+R,G+2+R) Townhouses, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2024-11-30Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
269 (G+1, G+2) townhouses in 2,3,4,5,6,7 plexes in Townhouses,The project designed to have a concrete structure and block with internal and external finishes.
Completion: 88.0% · Target 2025-12-30Status: ACTIVE - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
183 (G+2+R) Attached Villas in a Mix of 4 bed and 5 bed types .The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2025-06-30Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
35 (G+1+R &G+2+R), semi attached villas Villas, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2024-10-31Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
4 plex type 4 : G+1F+R 6 plex type 4 : G+1F+R G+1+R X 486 townhouses - Residential
Completion: 100.0% · Target 2022-08-30Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
240 Townhouses (G+1) Townhouses, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 94.7% · Target 2026-06-30Status: ACTIVE - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
Consists of (G+1)x 154 townhouses in 4,5,6,8 plexes in a max of 4 bed and 3 bed units
Completion: 100.0% · Target 2022-10-30Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
Consists of (G+1)431 townhouses in 4,5,6,8 plexes in a mix of 4 bed end units and 3 bedroom middle units on 77 plots
Completion: 100.0% · Target 2022-12-16Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
247 x (G+2), (G+1) Villas, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 100.0% · Target 2025-01-19Status: FINISHED - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
270 Townhouses (G+1) Townhouses, The project designed to have a concrete structure and block with internal and external finishes.
Completion: 62.7% · Target 2027-09-30Status: ACTIVE - Wadi Al Safa 5 · EMAAR DEVELOPMENT P.J.S.C.
G+1F+R x 430 Townhouses
Completion: 100.0% · Target 2023-03-25Status: FINISHED - Dubai Harbour (Marsa Dubai)
G+TH+M+2 Towers Tower 1: 29 Residential Floors + Roof Tower 2: 42 Residential Floors + Roof The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2025-10-31Status: FINISHED - DownTown Dubai (Burj Khalifa)
project consist of (shared 2B+G+M+3P)+ 2 towers Tower 1 - 2B+G+M+3P+66, 542 Residential Units, Freehold ownership Tower 2 - 2B+G+M+3P+22, 124 Residential Units, Freehold ownership with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2017-04-01Status: FINISHED - DownTown Dubai (Burj Khalifa)
Residential Tower 2B+G+6 Podiums +37+R with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2023-08-17Status: FINISHED - Dubai Harbour (Marsa Dubai)
Residential + Retail+ District Cooling Plant Building 1: 23F+R+1UR Building 2: 16F+R+1UR Podium (Shared): 1B+G+1M+4P+1
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2023-04-30Status: FINISHED - Dubai Harbour (Marsa Dubai)
B+G+7P+37+mechanical Roof+Machine Room+R ,Residential+Retail ,The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 42.9% · Target 2026-12-31Status: ACTIVE - Dubai Harbour (Marsa Dubai)
Building 1 (Tower A): 37F+R, Residential-Apartment Building 2 (Tower B): 23F+R, Residential-Apartment Podium (Shared): 1B+G+7P+R , Residential-Apartment + Commercial-Retail. The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 95.2% · Target 2025-12-30Status: ACTIVE - Dubai Harbour (Marsa Dubai)
The project is composed of B+G+MZ+6P+2 Towers Tower 1 : 45 Res Floors + Roof Tower 2 : 27 Res Floors + Roof having a total of 631 units Retail at Ground Floor / unit
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2023-05-30Status: FINISHED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 211 villas (G+1+roof)
Completion: 0.0% · Target 2029-06-30Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 206 villas (G+1+roof)
Completion: 0.0% · Target 2029-05-31Status: NOT_STARTED - Dubai Investment Park Second · EMAAR DEVELOPMENT P.J.S.C.
Residential development consisting of 219 villas (G+1+roof)
Completion: 0.0% · Target 2029-06-30Status: NOT_STARTED - DownTown Dubai (Burj Khalifa)
5B + 2P + G + 71 Floors having 870 Residential Units and 7 Retail, with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-06-30Status: FINISHED - DownTown Dubai (Burj Khalifa)
Common 5B+G+2P-Tower.1: 64+R & Tower.2:40+R Residential+Retail.The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 40.2% · Target 2026-12-25Status: ACTIVE - Arabian Ranches II - Reem Community (Wadi Al Safa 7)
The Project consists of 216 nos. G+1 Town Houses located in Wadi Al Safa 7, Dubai UAE. The Town Houses are designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2020-01-13Status: FINISHED - Dubai Harbour (Marsa Dubai)
Podium: G + 5 P TOWER 1: G + 24 F + 2 MECH + R TOWER2: G + 24 F + 2 MECH + R Comprising 457 residential Apartments & 4 retail units
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2021-10-31Status: FINISHED - Dubai Harbour (Marsa Dubai)
B+G+8P+ T1 57 + T2 42+R Residential,The project designed to have a concrete structure and block with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 9.8% · Target 2028-03-31Status: ACTIVE - Arabian Ranches II - Dhalia (Wadi Al Safa 7)
Consist of 168 free hold townhouses (G+1)
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2021-11-17Status: FINISHED - Arabian Ranches II - Camelia (Wadi Al Safa 7)
Consists of 258 free hold townhouses (G+1) with internal and external finishes.
Developer: EMAAR DEVELOPMENT P.J.S.C.Completion: 100.0% · Target 2022-01-07Status: FINISHED - Zaabeel Second · EMAAR DEVELOPMENT P.J.S.C.
TOWER TO CONSISIT OF G+9P+47 FLOORS +4 MECHANICAL FLOORS AND HAVE 478 RESIDENTIAL APARTMENT UNITS LOCATED IN DOHA ROAD DOWNTOWN DUBAI PODUIM TO CONSIST OF G+9 LEVELS AND HAVE 48 RESIDENTIAL APARTMENT UNITS
Completion: 100.0% · Target 2021-06-21Status: FINISHED